FORMAL SAFETY ASSESSMENT

Guidelines and Recommendations | Service Supplier Approval | QSCS | FSA Training | Class Symbols
Return to Main Menu


FORMAL SAFETY ASSESSMENT BULK CARRIERS

These documents present the FSA of bulk carriers, Fore-end watertight integrity, carried out by IACS as Work Package 5 of the UK-led international FSA of bulk carriers. The focus of the study has been on the fore-end of bulk carriers, including the evaluation of risk control options aimed at preventing or mitigating fore-end flooding scenarios. The scenarios investigated include the flooding of No. 1 cargo hold.

Report FSA Fore-end Watertight Integrity

(136Kb)

Annex 1 Basic Definitions and Abbreviations

(18Kb)

Annex 2 Bulk Carrier Risks

(240Kb)

Annex 3 Fore-end Watertight Integrity

(747Kb)

Annex 4 Hatch Cover Failure Scenarios

(1,560Kb)

Annex 5 Fore-end Flooding Scenarios

(236Kb)

Annex 6 Casualty Lists

(37Kb)

Annex 7 Names and Credentials

(17Kb)

Annex 8 Hazard Identification of Fore-end of Bulk Carriers

(290Kb)

Annex 9 Risk Control Options from Literature

(32Kb)

Annex 10 Risk Control Options Identified in Brainstorming Sessions

(9Kb)

Top of Page / Return to Main Menu

Formal Safety Assessment Bulk Carriers are in Adobe Acrobat PDF format.

To Download each PDF file for Offline Browsing:
PC Internet Explorer users: Right click and Save Target As
PC Netscape users: Right click and Save Link As
Mac Internet Explorer users: Hold mouse button and Save Target As
Mac Netscape users: Hold mouse button and Save Link As